Coronavirus and Delivery Updates

Coronavirus and Delivery Updates

Monday 27th September 2021

The current demand is still high for all types of garage doors and other building products in the UK. The entire supply chain worldwide is now suffering from sporadic outbreaks of Covid and new variants and the isolation rules preventing normal staff levels, and on top of this, and a larger problem now, is an increasing issue with general raw material and crucial component shortages. This is causing unmanageble delays in manufacturing and therefore delivery times and this situation changes daily. We will attempt to keep all updates coming as soon as we receive them regarding our supply chain and manufacturers and how this affects you. Our order confirmations providing an estimated delivery date after ordering are often delayed now because of the shortages.

There are now some unusual price increases imminent with all manufacturers due to the sudden price increases in steel, timber and aluminium worldwide. We will keep you updated as soon as they are announced.
We have special limited time offers on pricing to help combat the impending increases and offer the very best prices possible during August..

Updates 13th September
Hormann and Garador - Price increases from the 1st October on all door types at a minimum of 5%
Specific Hormann price increase on ALL timber Up and Over garage doors  -  15% increase on the 1st october
Gliderol - Price increase from the 4th October across all the ranges of roller doors - More details to folow when released


We recommend the earliest ordering of your garage door(s) as we see little change in general disruptions during 2021 due to demand and lack of supply of critical parts to complete many products. If a delivery date is very important to you we recommend speaking to us so we can make enquiries to get a far better idea of the potential timescales. This issue affects every single manufacturer without exception but affects some door sizes, colours and specifications more than others.
Please remember most of the doors we offer are made to measure as standard at no extra cost which is one of our unique offerings, providing customers with garage and pedestrian doors that fit perfectly to the opening and whilst we do have stock doors they are generally quite limited to just some up and over type doors.

All lead times below are estimates only (subject to change due to the on-going component shortages situation affecting all manufacturing at present).
Carteck -     Deliveries on selected sectional doors with a maximum of 3 weeks (possible delays however now, please check), non-stock sectionals approx. 6-8 weeks, insulated steel side hinged doors 10-12 weeks.
GDO -          8-10 weeks for all side hinged and up and over doors. Manufacturing delays with the GRP Doors, apologies for any inconvenience caused, approx. 10-12 weeks
                    currently. Personnel Doors - 8 weeks.
SWS -          Slightly extended lead time for roller doors and sectional doors. Roller Doors are now 4-6 weeks, Light Grey laths are on an extended lead-time, please allow 6+
                     weeks for delivery. Sectional Doors 8-10 Weeks. Round the Corner - 10 weeks.
Garador -     Delays on all doors. Side hinged doors up to 12 weeks. Spares/accessories and Motors also have delays. Extended leadtimes on Georgian, Beaumont and Cathedral
                     doors. Roller Doors - 6 weeks. Steel Stock Up and Over - 3-4 weeks, purpose made - 8-10 weeks. Timber and GRP Up and Over - 8-10 weeks. Garador sectional
                     (stock) - 3-4 weeks, purpose made - 6-8 weeks. Entrance Doors - 8 weeks. Garador Carlton 50/50 Side Hinged Doors are now on a 14 week+ delivery. Garador side
                     hinged and personnel doors currently not available to order due to extremely long lead times.
Hormann -   Extended delivery times on Sectional Doors and Side Doors. Some doors are awaiting stock so longer lead-times apply, changing daily. Non stock sectional doors
                    currently 10 weeks +. NT60 Doors at least 24 weeks. Roller Doors - 6 weeks. Timber Up and Over - 8-10 weeks. Personnel Doors - 6-8 weeks. Hormann Promatic
                    4 Operators are currently unavailable - Series 3 Operators will be provided in the mean time.

Gliderol -     4-6 weeks on manual doors. 6-8 weeks on electric.                     
Woodrite -   6-8 weeks for Idigbo doors and Accoya doors. Some Cedarwood door designs 3-4 weeks. Solid-Built Up and Over and Side Hinged Doors Lead-Times are now down
                     to 4 - 6 Weeks. Personnel Doors - 6-8 weeks. Masta-Gear Panel-Built Up and Over Doors 2 - 4 Weeks. Super-Chassis Panel-Build Up and Over 4 - 6 Weeks.
Cedar  -       8-10 weeks
Ryterna -     15+ weeks

 All deliveries carried out currently will be observing current government guidelines for non contact and signatures will generally not be requested.


Thank you for your understanding. Please Stay Safe, and we are extremely grateful for all the current and continuing business in these extraordinary difficult times.

 